- This event has passed.
Dane Trail Corridor Maintenance, Brooklyn SWA
November 12, 2017 @ 9:00 am
Each fall, we remove encroaching trees, brush and brambles from the trail corridor in preparation for the winter silent sports season. In additional to hand tool work, we may have work for power brush cutter operators or trained and aptly equipped chain sawyers. Contact leader for details. Meet at the main lot on Dane Hwy DD, about 0.6 miles south of its junction with Dane Hwy D.